Greenfield Development
Project Overview
Engineering Design Services supported a $78 million Total Installed Cost (TIC) greenfield industrial facility development, serving as the Engineer’s Representative throughout the project lifecycle. The project involved close coordination between the client, prime contractor, and multiple engineering disciplines to ensure alignment between design intent and field execution over a 10-month construction schedule.
industry
Petrochemicals
Location
Texas
Result & Impact
• Supported successful execution of a $78M greenfield industrial facility
• Ensured alignment between engineering design intent and field construction activities
• Improved coordination across multiple engineering disciplines and stakeholders
• Helped maintain project schedule adherence over a 10-month execution period
• Verified constructability and operational practicality of facility layouts
• Contributed to the delivery of a fully optimized, efficient, and reliable industrial asset
Engineering Tools & Technologies
• Multidisciplinary engineering coordination (civil, structural, mechanical, process)
• Engineering deliverable review and management systems
• Construction coordination and field support processes
• Project lifecycle and schedule tracking tools


